Hydroelectric Development on Umbata Falls
Site Area Details

Overflow Crest Structure


Cross Section "A" - The Concrete Gravity Dam with Rubber Weir
Built to resist earthquake, water pressure, and ice impact.

The Rubber Weir
An efficient system to control and maintain a permanent ecological flow is by using a compressor (blower) to inflate the structure. The main advantages for using a rubber weir are:
Low visual and environmental impact (overflow crest)
Long service life (over 30 years)
Low maintenance
Excellent operational features in ice conditions
Safe defaltion during freshet
Ability to control water level

Proceed to next page:
The Intake Structure

Umbata Hydroelectric Project
Copyright © 2004-2006 Begetekong Power Corporation • www.BegetekongPower.com